What it's costing you

Losses, per week

$0

downtime $0 · scrap $0 · changeover $0

Losses, per year

$0

Conservative savings, per year

$0

Spall cost, year one

$0

Net, year one

$0

ROI multiple

0x

Payback

0 wks

These are your numbers — the pilot's job is to beat this conservative case.

Book a pilot →

Every figure above is computed live from the values you entered — no black box. Here is the formula behind each number, with your current inputs plugged in.

Downtime loss / week

machines × downtime hrs/machine/wk × downtime $/hr

= × hr × /hr =

Scrap loss / week

machines × parts/hr × (hrs/shift × shifts/day × days/wk) × scrap % × cost/part

= × × hr × × =

Changeover tax / week

lines × changeovers/line/wk × (avg changeover min ÷ 60) × downtime $/hr

= × × ( min ÷ 60) × /hr =

Losses / year

(downtime + scrap + changeover) × 52 weeks

= × 52 =

Conservative savings / year

(downtime × cut% + scrap × cut% + changeover × cut%) × 52

= ( × + × + × ) × 52 =

Spall cost / year one

(lines × $1,500 kit) + max(machines × per-machine tier × 12, $12,000 floor). Tiers: $150/machine (≤10), $120 (11–25), $100 (25+).

= ( × $1,500) + max( × × 12, $12,000) =

Net · ROI · payback

net = savings − cost · ROI = savings ÷ cost · payback = cost ÷ savings/wk

net = · ROI = · payback =

Honest caveat: the loss inputs and improvement percentages above are the calculator's conservative defaults unless you changed them — they are not measured from your plant. The pilot replaces every one of these with numbers read off your own machines; its whole job is to beat this case.

This calculator uses the same loss formulas as the Spall pricing model (weekly downtime = machines × hours × rate; scrap = machines × throughput × scrap rate × part cost; changeover = lines × count × minutes × rate) and the published tiered pricing — $150/machine (≤10), $120/machine (11–25), $100/machine (25+), floor $12,000/yr, plus a $1,500 hardware kit per line.